Updates

AREA DEVELOPMENT:

  • Schools - Delhi Public School [DPS], Ryan International School, Gurukul at 3 km radius-already functioning
  • Proposed BCCI International Cricket Stadium at a distance of 3 kms from our society.
  • Proposed Delhi Metro Link-Station at Mahrauli-at a distance of 1-1/2 kms from our society
  • ISKCON temple just opposite to our site-construction going on
  • Wave city has already given possession of plots and low rise buildings in Sector 1, 2 & 5.
  • Three basic needs, Electricity, Water and Sewer connection is already at place in our sector. Once the     structure is completed the society will deposit the security deposit and take connection from Wave City.

Our project is approved by State Bank of India, India Bulls, Union Bank of India and Corporation Bank.

Sanchar Nest SAS Ltd., takes pride in announcing the scheme for sale of shops through auction. Last date for
submission of application form along with 10% of the cost of the shop is 14.08.2015. For further details about the scheme and application form please visit the Circular Column.

We take pride to inform that the tender for the work on expansion of NH-24 from four lanes to eight lanes has been floated by NHAI. On completion of this work it would be a 10 minute drive from Delhi-UP Border to our site. We hope this would give us independence from the long traffic jam presently prevailing in this route.

Also work has been awarded to six packages of construction of Eastern Peripheral Expressway. The contract period is 30 months.This package of expressway passes through Baghpat, Ghaziabad, Greater Noida, Sonepat and Faridabad and intersects with NH-1, NH-2, NH-24, NH-58, NH-91, SH-57, Hindon Expressway and Yamuna Expressway. It also passes through Wave City, NH-24, Ghaziabad

GOOD NEWS: WIDENING OF NH-24-DELHI TO HAPUR:

Our Prime Minister, Mr. Narendra Modi, on Thursday, 31.12.2015, laid the foundation stone of widening work of stretch of NH-24 [Delhi - Hapur corridor]. The stretch between Nizamuddin Bridge to Dasna will be 14 lanes [6-Lane Expressway and 8-Lane Highway] and the stretch from Dasna to Hapur will be 6-Lane Highway. The target for completion of this project is 30 months. On expansion of this stretch the running time from Nizamuddin Bridge to our site will be reduced considerably. For more details please visit our Circular Column.

AREA DEVELOPMENT: Wave City Police Chowki has been opened in the plot adjoining our site. It will work under the Massourie Police Station. This will create a positive sense of feeling among citizens who want to shift their residence inside Wave City.

The Management Committee takes pleasure to inform all members that the 57-metre road connecting our site to NH-24 is fully operational.

The Management Committee with immense pleasure would like to inform that work in all the three towers is being carried out in good pace.

The structural work of all the three towers is under completion and finishing work is being carried out simultaneously in all the three towers.

For actual site photograph please visit Photo Gallery.